King School depaving comes to fruition!
[bing_translator] After years of quiet grumbling by parents about the school being girded in asphalt, approximately 6.5 tons of the material came up in about an hour thanks to enthusiastic volunteers and meticulous pre-cutting. Following the depave, the depleted soil underneath was removed by excavator. That soil was replaced with a new soil and compost…